India, Nepal Conform to Take Ahead Sapta Kosi Excessive Dam Mission Together with Mahakali Treaty

India and Nepal have agreed to take ahead the Sapta Kosi excessive dam undertaking by means of additional research, as senior officers of the 2 sides met right here and comprehensively reviewed the bilateral water-sector cooperation, together with the implementation of the Mahakali Treaty and cooperation in areas of flooding and inundation.

The ninth assembly of the Joint Committee on Water Sources (JCWR), co-chaired by Pankaj Kumar, Secretary, Division of Water Sources, River Growth and Ganga Rejuvenation, Ministry of Jal Shakti, Authorities of India and Sagar Rai, Secretary, Ministry of Power, Water Sources and Irrigation, was held in Kathmandu on Friday.

This was preceded by the seventh assembly of the Joint Standing Technical Committee on Water Sources on September 21-22.

The assembly was co-chaired by M Ok Srinivas, Chairman, Ganga Flood Management Fee, Patna and Shishir Koirala, Joint Secretary, Ministry of Power, Water Sources and Irrigation, Authorities of Nepal in Kathmandu.

These conferences comprehensively reviewed the bilateral water-sector cooperation between India and Nepal, together with the implementation of the Mahakali Treaty, the Sapta Kosi-Solar Kosi Mission and cooperation in areas of flooding and inundation, the Indian Embassy stated in a press release.

The Mahakali Treaty was signed in 1996 over the built-in improvement of the Mahakali River, together with Sarada Barrage, Tanakpur Barrage and Pancheshwar undertaking.

“The progress of assorted bilateral committees, together with Joint Committee on Inundation and Flood Administration (JCIFM) and Joint Committee on Kosi and Gandak Mission (JCKGP), was additionally mentioned,” it stated.

It was agreed to take ahead the Sapta Kosi excessive dam undertaking by means of additional research which take into accounts the deliberate upstream initiatives, submergence space of the Mission in addition to different social, environmental and technical points, the assertion stated.

The Joint Staff of Consultants is predicted to fulfill quickly. Sapta Kosi Excessive Dam is a multipurpose undertaking proposed to be constructed on the Saptakoshi River of Nepal. The undertaking is primarily aimed to regulate floods in south-east Nepal and northern Bihar and to generate hydropower.

Recalling the India-Nepal Joint Imaginative and prescient Assertion on Energy Sector Cooperation issued in the course of the go to of Prime Minister Sher Bahadur Deuba to India in April 2022, the place the 2 Prime Ministers (Narendra Modi and Deuba) directed their involved officers to expedite the bilateral discussions in the direction of the early finalisation of the undertaking’s DPR (Detailed Mission Report), the JCWR prolonged the tenure of the Staff of Consultants (ToE) unto March 2023 for the finalisation of the DPR of Pancheshwar Multipurpose Mission and agreed to carry the 4th ToE assembly on the earliest.

The Nepali facet thanked India for the help prolonged to Nepal relating to irrigation, flood administration, inundation management, river embankment works, and so on.

The Indian facet highlighted the distinctive relationship between the 2 nations and the significance of correct administration and utilization of water sources for mutual profit. Water Sources Secretary Pankaj Kumar known as on Minister for Power, Water Sources and Irrigation, Pampha Bhusal after the assembly. Kumar can also be anticipated to name on Prime Minister Deuba.

Learn all of the Newest Information India and Breaking Information right here

Supply hyperlink

Leave a Comment